WE NOW OFFER WORLDWIDE DELIVERY - YOU WILL SEE ALL THE DELIVERY OPTIONS ON CHECKOUT

Getting the length right is one of the most important parts of ordering a replacement halyard or sheet. A rope that is too short may be unusable; one that is unnecessarily long adds cost and clutter. We recommend measuring the actual arrangement on the yacht and checking the required finished length before ordering.

Before you start

Record the yacht model, the line's purpose, the existing rope diameter and construction, and whether the new rope will have a splice, shackle or plain end. It also helps to photograph the deck layout and note where the line finishes.

If the old rope works correctly and is known to be the right length, measure it under light tension as a useful reference. Do not assume a previous owner's rope length was correct.

How to measure a halyard

  1. Identify the full route. Follow the halyard from the sail attachment up to the masthead sheave, back down the mast and through any turning blocks, deck organisers and clutch to the working position.
  2. Check both end positions. The halyard must reach the sail attachment when the sail is down and still leave a usable tail when the sail is fully hoisted.
  3. Measure the working tail. Allow enough rope beyond the clutch or cleat for the winch, handling and normal trimming. The required tail depends on the yacht and deck arrangement.
  4. Allow for the finished termination. A splice, shackle or tapered section needs to be specified before the rope is cut. Ask whether the supplier's quoted length is the finished overall length or the pre-splice cutting length.
  5. Check for special arrangements. A 2:1 halyard has a different rope path from a conventional 1:1 halyard. Masthead height alone is not a reliable calculation for every system.

Where the old halyard is missing, a messenger line or suitable measuring line can be passed through the complete route. Ensure the messenger is secure and cannot be pulled out of the mast accidentally.

How to measure a sheet

For a genoa or jib, follow the sheet from the sail clew through the normal fairlead and turning blocks to the winch. Check the longest working position, including the amount needed for tacking, winch turns and a safe tail. For twin genoa sheets, measure each side rather than assuming the deck arrangements are identical.

For a mainsheet, the amount of rope depends on the purchase and the distance the tackle travels. A 6:1 mainsheet system requires substantially more rope than the straight-line distance between its blocks. Measure the actual reeving and confirm the boom can travel through the intended range.

Allowances that are easy to miss

Item Why it affects length
Cockpit lead and deck organisers Add distance compared with a halyard ending at the mast
Winch tail Allows safe handling through the full operating range
Splice or shackle Changes the finished termination and usable length
Tapered halyard Taper must finish in the correct place at full hoist
Mainsheet purchase Multiplies rope travel through the tackle
2:1 halyard Needs its own measurement, not a standard mast-height rule

What diameter and rope type should you order?

Length is only part of the specification. Check the rope diameter against the mast sheaves, clutches, jammers, winches and blocks. A smaller, low-stretch Dyneema rope may be attractive for performance, but must still be compatible with the hardware and suitable for the application. See our running rigging guides for more on construction and materials.

Final check before cutting

Confirm finished overall length, diameter, rope type, colour, end fittings and which end is to be spliced. For halyards, check that the shackle reaches the sail attachment with the sail lowered and that the clutch and winch still have sufficient tail at full hoist. For sheets, check the full range of travel before cutting away any surplus.

We can supply replacement ropes, halyards and sheets with the required finishing. You can also view running rigging packages by yacht or contact us with your measurements for a quotation.

Ready to Replace Your Running Rigging?

Whether you know your measurements or need advice, we can help specify your replacement halyards and sheets.

Build Your Running Rigging Package

Find replacement running rigging for your yacht.

Build Your Running Rigging Package →

Explore Running Rigging

Browse ropes, halyards and sheets.

Explore Running Rigging →

Contact Our Rigging Team

Get help with rope selection and measurements.

Contact Our Rigging Team →

Boxed:

Sticky Add To Cart

Font: