Reefing lines, outhauls and control lines do different jobs, so they should not all be replaced with one generic rope specification. Correct rope construction, diameter, finished length and hardware compatibility depend on the loads, purchase arrangement and sail-control function on your yacht.
Line function
Reefing, outhaul, kicker and Cunningham controls need different properties.
Reeving
Trace every sheave, purchase, deck organiser and clutch before ordering.
Measurements
Record finished length and tail at maximum travel, not yacht length alone.
Hardware
Check sheave size, grip, chafe points and manufacturer load ratings.
Which yacht control lines are we talking about?
| Line | Purpose | Main replacement considerations |
|---|---|---|
| Reefing line | Secures and tensions the reefed mainsail at the clew and/or tack, depending on the system. | Reefing geometry, abrasion at boom and sail, friction, working load and clutch compatibility. |
| Outhaul | Controls mainsail foot tension or the clew position. | Low stretch where precision matters, in-boom purchase, travel and sheave compatibility. |
| Kicker / vang control | Controls boom height and leech tension via a tackle or rigid vang system. | High purchase loads, tail handling, block ratings, abrasion and a suitable finish. |
| Cunningham / downhaul | Adjusts luff tension or other sail-control positions. | Small-line handling, purchase ratio, grip and low creep under working tension. |
| Other controls | Traveller, barber hauler, pole topping lift or similar controls. | Functional load, routing, frequency of adjustment and the equipment manufacturer's specification. |
Single-line reefing versus conventional slab reefing
On a conventional slab-reefing system, the tack and clew may be secured or tensioned by separate arrangements. In a single-line system, one control line may run through several internal boom and sail attachment points to control both ends of a reef. The latter can be convenient from the cockpit but introduces additional routing and friction.
Do not assume the reefing rope length is simply two or three times the boom length. It depends on internal boom sheaves, the reef position, boom and sail geometry, the chosen leads and the distance to the working winch or clutch. Use the existing line or a secure mousing line to confirm the route before removal, following the boom manufacturer's instructions.
What rope should I use for a reefing line?
For many cruising yachts, a suitable covered polyester or mixed-fibre double braid provides a durable and manageable reefing line. Where low stretch and higher working loads justify it, a Dyneema-core construction may be appropriate. However, the choice must also suit the boom sheaves, hardware size, clutch grip, abrasion exposure and the operator's handling needs. An unsupported change to thinner or higher-strength rope can lead to grip or chafe problems even if its breaking load is greater.
Choosing an outhaul and other high-purchase control lines
Outhauls, vang tackles and Cunningham systems may use internal purchases that multiply rope movement and change the tension experienced by individual sections. Low-stretch ropes can improve repeatability, but flexibility and resistance to repeated bends matter too. An exposed high-modulus core may need a protective cover or different termination in high-chafe areas. Follow the manufacturer's instructions for end fittings, splices and minimum bend radii.
How to measure replacement control lines
- Identify the system. Photograph the line in place and label all attachment points, blocks, sheaves, organisers and clutches.
- Record the current rope. Measure diameter, construction, overall length and end treatment. Note any tapered sections or buried splice tails.
- Check working extremes. Confirm the slack and fully loaded positions and how much useful tail is required at the cockpit or mast.
- Mouse lines out carefully. If the rope must be removed through a mast or boom, use a suitable mousing line and secure connection so the routing is not lost. Never improvise under sail load.
- Check the hardware. Inspect sheaves, clutches and blocks for grooves, cracked housings, misalignment, sharp edges and the correct rope-diameter range.
- Confirm the finished specification. Share photographs and the route with Martin Leaning Masts and Rigging before ordering a custom-made line.
For additional measuring advice, read How to Measure Halyards and Sheets; for rope construction and handling, see our Running Rigging Selection Guide.
What if the reefing line or outhaul keeps jamming?
The rope may be too large for a sheave, the lead may be misaligned, a block may be seized, or the boom's internal routing may be damaged. Replacing rope alone will not correct a mechanical fault. Inspect the full system and consult the boom manufacturer's documentation rather than increasing winch load to force a jammed line.
Frequently asked questions
Can I use the same rope for the outhaul and reefing lines?
Sometimes, but they serve different functions. Choose each rope by expected load, stretch, bend and handling requirements, then confirm compatibility with its own hardware.
Can I replace a reefing line while the boom is fitted?
Often yes if the routing is accessible and a mousing line can be secured safely. Internal boom systems and inaccessible fittings vary; review the relevant manufacturer's instructions and ensure the sail and line are unloaded.
Are reefing lines included in every yacht running rigging package?
Not necessarily. The standard yacht-specific packages focus primarily on specified halyards and sheets. Check the actual line list and request additional reefing and control lines separately where required.
Explore Related Guides
Further practical advice from our rigging team to help you plan maintenance and replacement work.
Replace Your Yacht's Control Lines
Specify the correct rope and finish for your reefing, outhaul or other control system.
These are general principles only. Control systems carry significant loads; inspect the equipment, follow manufacturer guidance and obtain competent assistance where the reeving or safe working load is uncertain.