WE NOW OFFER WORLDWIDE DELIVERY - YOU WILL SEE ALL THE DELIVERY OPTIONS ON CHECKOUT

This guide gives Hanse 355 owners a structured way to plan standing-rigging replacement alongside the other mast and deck equipment that may be involved. The model page is intended to support both a simple standing-rigging replacement and a broader refit where ropes, furling equipment or deck hardware are being reviewed at the same time. The existing yacht should therefore take priority over any generic model assumption, especially where a mast, furler or set of rigging screws has been replaced before. The final check should identify each stay individually and capture wire size, finished length, terminal geometry, pin diameters, rigging screws and any furler components that determine the forestay length.

Yacht and Rig Details

ProductionGermany, 2005–2015
LOA10.82 m
Beam3.73 m
Displacement6,700 kg
RigFractional sloop
Mast steppingDeck stepped
Spreaders1

Hanse 355 standing rigging

Indicative forestay/backstay/shroud diameter7 mm
Rigging type1x19 stainless steel wire
Indicative standing rigging cost£2,169 – £2,385 inc VAT

Furler and kicker recommendations

Genoa furler Furlex 204S — 13.90 m
Rodkicker Seldén Rodkicker 20 (Normal Gas)

Mast and boom recommendations

Suggested mast sectionC124
Indicative mast height14.61 m
Suggested boom sectionE219
Indicative boom foot length4.09 m
ReefingSlab reefing (2 reef lines)

Hanse 355 running rigging

LineDiameterLengthSuggested rope
Main halyard 10 mm 31 m Dyneema
Genoa halyard 10 mm 32.8 m Dyneema
Spinnaker halyard 10 mm 35.2 m Dyneema
Genoa sheets 12 mm 21.5 m per sheet Marlow Ocean Braid
Main sheet 12 mm 10 m Marlow Ocean Braid

These specifications and prices are indicative only and should be verified against the rig and existing equipment on the individual yacht.

Boxed:

Sticky Add To Cart

Font: