This guide gives Moody 376 owners a structured way to plan standing-rigging replacement alongside the other mast and deck equipment that may be involved. The equipment tables are deliberately separate from the standing-rigging cost, allowing a basic replacement set to be planned first and extra sail-handling or deck-hardware items added only where useful. Factory options and later refits can produce meaningful differences between sisterships, particularly around the forestay, furler, mast terminals and lower attachment points. If the old rigging is available, copying the original stay set after checking its condition and dimensions is usually more dependable than manufacturing solely from a model-based schedule.

Yacht and rig details

ProductionUnited Kingdom, 1985–1991
LOA11.46 m
Beam3.84 m
Displacement7,600 kg
RigMasthead sloop
Mast steppingDeck stepped
Spreaders1

376 standing rigging

Indicative forestay/backstay/shroud diameter7 mm
Rigging type1x19 stainless steel wire
Indicative standing rigging cost£2,210 – £2,432 inc VAT

Furler and kicker recommendations

Genoa furler Furlex 304S — 15.25 m
Rodkicker Seldén Rodkicker 20 (Normal Gas)

Mast and boom recommendations

Suggested mast sectionC124
Indicative mast height16.04 m
Suggested boom sectionE219
Indicative boom foot length4.49 m
ReefingSlab reefing (2 reef lines)

376 running rigging

LineDiameterLengthSuggested rope
Main halyard 10 mm 34 m Dyneema
Genoa halyard 10 mm 35.5 m Dyneema
Spinnaker halyard 10 mm 38.1 m Dyneema
Genoa sheets 12 mm 23 m per sheet Marlow Ocean Braid
Main sheet 12 mm 11 m Marlow Ocean Braid

These specifications and prices are indicative only and should be verified against the rig and existing equipment on the individual yacht.