WE NOW OFFER WORLDWIDE DELIVERY - YOU WILL SEE ALL THE DELIVERY OPTIONS ON CHECKOUT

This guide gives J/105 owners a structured way to plan standing-rigging replacement alongside the other mast and deck equipment that may be involved. If the project extends beyond the stays, the same page can also be used to review halyards and sheets, furling equipment, kicker options, winches and replacement spar guidance. A previous owner may have changed the furler, turnbuckles or mast hardware without altering the overall rig plan, so those details should be recorded before a new set is ordered. The final check should identify each stay individually and capture wire size, finished length, terminal geometry, pin diameters, rigging screws and any furler components that determine the forestay length.

Yacht and Rig Details

ProductionUnited States, 1991–2016
LOA10.51 m
Beam3.35 m
Displacement3,515 kg
RigFractional sloop
Mast steppingKeel stepped
Spreaders2

J/Boats J/105 standing rigging

Indicative forestay/backstay/shroud diameter7 mm
Rigging typeRod rigging
Indicative standing rigging cost£ TBC inc VAT

Furler and kicker recommendations

Genoa furler Harken Unit 1 MKIV Ocean — factory-equivalent replacement
Rodkicker Rigid boom vang (factory)

Mast and boom recommendations

Suggested mast sectionHall 166
Suggested boom sectionHall 128
Indicative boom foot length4.45 m
ReefingSlab reefing (2 reef lines)

J/Boats J/105 running rigging

LineDiameterLengthSuggested rope
Main halyard 10 mm 31.7 m Marlow Ocean Braid
Genoa halyard 10 mm 28.04 m Marlow Ocean Braid
Spinnaker halyard 10 mm 30.48 m Marlow Ocean Braid
Genoa sheets 12 mm 15.24 m per sheet Marlow Ocean Braid
Main sheet 12 mm 30.48 m Marlow Ocean Braid

These specifications and prices are indicative only and should be verified against the rig and existing equipment on the individual yacht.

Boxed:

Sticky Add To Cart

Font: