WE NOW OFFER WORLDWIDE DELIVERY - YOU WILL SEE ALL THE DELIVERY OPTIONS ON CHECKOUT

For a Westerly 22, this page provides a practical starting point for planning replacement standing rigging and related equipment work. Owners can use the individual sections to compare the core re-rig with optional furler, kicker, winch, rope and mast-or-boom work before requesting a detailed estimate. Factory options and later refits can produce meaningful differences between sisterships, particularly around the forestay, furler, mast terminals and lower attachment points. A reliable production schedule should record stay count, wire or rod size, finished dimensions, mast terminals, chainplate pins, turnbuckle threads and the forestay connection through the fitted furler.

Yacht and Rig Details

ProductionUnited Kingdom, 1963–1967
LOA6.71 m
Beam2.08 m
Displacement1,557 kg
RigFractional sloop
Mast steppingDeck stepped
Spreaders1

Westerly 22 standing rigging

Indicative forestay/backstay/shroud diameter4 mm
Rigging type1x19 stainless steel wire
Indicative standing rigging cost£1,077 – £1,301 inc VAT

Furler and kicker recommendations

Genoa furler Furlex 50S — 6.04 m
Rodkicker Seldén Rodkicker 5 (Normal Gas)

Mast and boom recommendations

Suggested mast sectionC083
Indicative mast height11.09 m
Suggested boom sectionE165
Indicative boom foot length3.11 m
ReefingSlab reefing (2 reef lines)

Westerly 22 running rigging

LineDiameterLengthSuggested rope
Main halyard 8 mm 25 m Marlow Ocean Braid
Genoa halyard 8 mm 26.1 m Marlow Ocean Braid
Spinnaker halyard 8 mm 28.2 m Marlow Ocean Braid
Genoa sheets 10 mm 12.7 m per sheet Marlow Ocean Braid
Main sheet 10 mm 16.5 m Marlow Ocean Braid

These specifications and prices are indicative only and should be verified against the rig and existing equipment on the individual yacht.

Boxed:

Sticky Add To Cart

Font: