The Westerly Conway 36 is covered in our rigging database so owners can begin a replacement project with a consistent set of cost and equipment references. Owners can use the individual sections to compare the core re-rig with optional furler, kicker, winch, rope and mast-or-boom work before requesting a detailed estimate. Even apparently standard production boats can acquire different fittings over time, so photographs and measurements from the current rig are more useful than relying on the model name alone. To turn the model guide into a manufacturing specification, measure the existing stays and confirm terminal forms, pin sizes, turnbuckle threads and the exact way the forestay connects to the furler.
Yacht and Rig Details
| Production | United Kingdom, 1975–1979 |
|---|---|
| LOA | 10.97 m |
| Beam | 3.73 m |
| Displacement | 6,806 kg |
| Rig | Masthead sloop |
| Mast stepping | Deck stepped |
| Spreaders | 1 |
Westerly Conway 36 standing rigging
| Indicative forestay/backstay/shroud diameter | 8 mm |
|---|---|
| Rigging type | 1x19 stainless steel wire |
| Indicative standing rigging cost | £2,594 – £2,964 inc VAT |
Need replacement standing rigging for your Westerly Conway 36? Choose the rigging options you want included, then use the Request Estimate button to send us your yacht details and selected items. You can also explore our yacht standing rigging replacement options, or see our standing rigging replacement cost guide.
Furler and kicker recommendations
| Genoa furler | Furlex 204S — 9.88 m |
|---|---|
| Rodkicker | Seldén Rodkicker 20 (Normal Gas) |
Mast and boom recommendations
| Suggested mast section | C211 |
|---|---|
| Indicative mast height | 14.94 m |
| Suggested boom section | E300 |
| Indicative boom foot length | 4.18 m |
| Reefing | Slab reefing (2 reef lines) |
Westerly Conway 36 running rigging
| Line | Diameter | Length | Suggested rope |
|---|---|---|---|
| Main halyard | 10 mm | 31.9 m | Dyneema |
| Genoa halyard | 10 mm | 33.4 m | Dyneema |
| Spinnaker halyard | 10 mm | 35.9 m | Dyneema |
| Genoa sheets | 12 mm | 17.1 m per sheet | Marlow Ocean Braid |
| Main sheet | 12 mm | 22.5 m | Marlow Ocean Braid |
Build your Westerly Conway 36 Running Rigging Package →
Need replacement running rigging for your Westerly Conway 36? Choose the running rigging you want included, then use the Request Estimate button to include it in your enquiry. You can also explore our yacht and dinghy running rigging replacement options, or read our complete guide to running rigging.
These specifications and prices are indicative only and should be verified against the rig and existing equipment on the individual yacht.