WE NOW OFFER WORLDWIDE DELIVERY - YOU WILL SEE ALL THE DELIVERY OPTIONS ON CHECKOUT

Owners considering a re-rig on a Westerly Merlin 28 can use this page to establish the likely project scope before the existing stays are measured. Because a re-rig often exposes related wear, the page also gives reference points for running rigging, furling, kicker and winch equipment rather than treating the stays in isolation. Factory options and later refits can produce meaningful differences between sisterships, particularly around the forestay, furler, mast terminals and lower attachment points. Where measurements are being supplied remotely, clear photographs of every upper and lower termination should accompany the finished lengths, wire sizes, pin diameters and rigging-screw details.

Yacht and Rig Details

ProductionUnited Kingdom, 1984–1990
LOA8.53 m
Beam2.81 m
Displacement3,200 kg
RigFractional sloop
Mast steppingDeck stepped
Spreaders1

Westerly Merlin 28 standing rigging

Indicative forestay/backstay/shroud diameter6 mm
Rigging type1x19 stainless steel wire
Indicative standing rigging cost£1,575 – £1,728 inc VAT

Furler and kicker recommendations

Genoa furler Furlex 104S — 7.68 m
Rodkicker Seldén Rodkicker 10 (Normal Gas)

Mast and boom recommendations

Suggested mast sectionC095
Indicative mast height11.94 m
Suggested boom sectionE169
Indicative boom foot length3.34 m
ReefingSlab reefing (2 reef lines)

Westerly Merlin 28 running rigging

LineDiameterLengthSuggested rope
Main halyard 10 mm 26.5 m Marlow Ocean Braid
Genoa halyard 10 mm 27.7 m Marlow Ocean Braid
Spinnaker halyard 10 mm 29.9 m Marlow Ocean Braid
Genoa sheets 12 mm 13.6 m per sheet Marlow Ocean Braid
Main sheet 12 mm 18 m Marlow Ocean Braid

These specifications and prices are indicative only and should be verified against the rig and existing equipment on the individual yacht.

Boxed:

Sticky Add To Cart

Font: