This guide gives Albin Vega 27 owners a structured way to plan standing-rigging replacement alongside the other mast and deck equipment that may be involved. The standing-rigging section can be used for initial budgeting, while the running-rigging and equipment tables help identify additional work that may sensibly be completed at the same time. Model data is most valuable when it is compared with the boat in front of you, because small hardware changes can affect the finished length and termination required for a replacement stay. To turn the model guide into a manufacturing specification, measure the existing stays and confirm terminal forms, pin sizes, turnbuckle threads and the exact way the forestay connects to the furler.

Yacht and rig details

ProductionSweden, 1980–1995
LOA8.25 m
Beam2.46 m
Displacement2,300 kg
RigSloop
Mast steppingDeck stepped
Spreaders1

Vega 27 standing rigging

Indicative forestay/backstay/shroud diameter5 mm
Rigging type1x19 stainless steel wire
Indicative standing rigging cost£1,223 – £1,398 inc VAT

Furler and kicker recommendations

Genoa furler Furlex 50S — 7.25 m
Rodkicker Seldén Rodkicker 5 (Normal Gas)

Mast and boom recommendations

Suggested mast sectionC170
Indicative mast height7.90 m
Suggested boom sectionE270
Indicative boom foot length3.30 m
ReefingSlab reefing (2 reef lines)

Vega 27 running rigging

LineDiameterLengthSuggested rope
Main halyard 8 mm 19.2 m Marlow Ocean Braid
Genoa halyard 8 mm 20 m Marlow Ocean Braid
Spinnaker halyard 8 mm 21.8 m Marlow Ocean Braid
Genoa sheets 10 mm 13.2 m per sheet Marlow Ocean Braid
Main sheet 10 mm 16.2 m Marlow Ocean Braid

These specifications and prices are indicative only and should be verified against the rig and existing equipment on the individual yacht.

Boxed:

Sticky Add To Cart

Font: