WE NOW OFFER WORLDWIDE DELIVERY - YOU WILL SEE ALL THE DELIVERY OPTIONS ON CHECKOUT

Owners considering a re-rig on a Contest 45CS can use this page to establish the likely project scope before the existing stays are measured. The standing-rigging section can be used for initial budgeting, while the running-rigging and equipment tables help identify additional work that may sensibly be completed at the same time. Factory options and later refits can produce meaningful differences between sisterships, particularly around the forestay, furler, mast terminals and lower attachment points. Before ordering, compare the model page with the actual rig and resolve any difference in stay layout, wire size, end fittings, pin dimensions, rigging screws or furler connections.

Yacht and Rig Details

ProductionNetherlands, 1974–1984
LOA13.72 m
Beam4.10 m
Displacement19,325 kg
RigFractional sloop
Mast steppingDeck stepped
Spreaders2

Contest 45CS standing rigging

Indicative forestay/backstay/shroud diameter10 mm
Rigging type1x19 stainless steel wire
Indicative standing rigging cost£4,421 – £4,982 inc VAT

Furler and kicker recommendations

Genoa furler Furlex 304S — 14.25 m
Rodkicker Seldén Rodkicker 30 (Normal Gas)

Mast and boom recommendations

Suggested mast sectionC211
Indicative mast height19.89 m
Suggested boom sectionE300
Indicative boom foot length4.39 m
ReefingSlab reefing (3 reef lines)

Contest 45CS running rigging

LineDiameterLengthSuggested rope
Main halyard 12 mm 40.8 m Dyneema
Genoa halyard 12 mm 42.8 m Dyneema
Spinnaker halyard 12 mm 45.8 m Dyneema
Genoa sheets 14 mm 21.9 m per sheet Marlow Ocean Braid
Main sheet 14 mm 29.3 m Marlow Ocean Braid

These specifications and prices are indicative only and should be verified against the rig and existing equipment on the individual yacht.

Boxed:

Sticky Add To Cart

Font: