WE NOW OFFER WORLDWIDE DELIVERY - YOU WILL SEE ALL THE DELIVERY OPTIONS ON CHECKOUT

For a J/120, this page provides a practical starting point for planning replacement standing rigging and related equipment work. The page separates standing rigging from running rigging and deck equipment, making it easier to decide which items belong in the immediate refit and which can remain optional. Model data is most valuable when it is compared with the boat in front of you, because small hardware changes can affect the finished length and termination required for a replacement stay. A reliable production schedule should record stay count, wire or rod size, finished dimensions, mast terminals, chainplate pins, turnbuckle threads and the forestay connection through the fitted furler.

Yacht and Rig Details

ProductionUnited States, 1994–2006
LOA12.19 m
Beam3.66 m
Displacement6,305 kg
RigFractional sloop
Mast steppingKeel stepped
Spreaders2

J/Boats J/120 standing rigging

Indicative forestay/backstay/shroud diameter8 mm
Rigging typeRod rigging
Indicative standing rigging cost£ TBC inc VAT

Furler and kicker recommendations

Genoa furler Harken Unit 2 MKIV Ocean — replacement for original Unit 1.5
Rodkicker Hall Quik-Vang C-24

Mast and boom recommendations

Suggested mast sectionHall 205
Suggested boom sectionHall 166
Indicative boom foot length5.43 m
ReefingSlab reefing (2 reef lines)

J/Boats J/120 running rigging

LineDiameterLengthSuggested rope
Main halyard 10 mm 37.49 m Dyneema
Genoa halyard 10 mm 35.66 m Dyneema
Spinnaker halyard 10 mm 39.93 m Dyneema
Genoa sheets 12 mm 18.29 m per sheet Marlow Ocean Braid
Main sheet 12 mm 21.34 m Marlow Ocean Braid

These specifications and prices are indicative only and should be verified against the rig and existing equipment on the individual yacht.

Boxed:

Sticky Add To Cart

Font: