WE NOW OFFER WORLDWIDE DELIVERY - YOU WILL SEE ALL THE DELIVERY OPTIONS ON CHECKOUT

Owners considering a re-rig on a Moody 333 can use this page to establish the likely project scope before the existing stays are measured. The equipment tables are deliberately separate from the standing-rigging cost, allowing a basic replacement set to be planned first and extra sail-handling or deck-hardware items added only where useful. Even apparently standard production boats can acquire different fittings over time, so photographs and measurements from the current rig are more useful than relying on the model name alone. Before manufacture, confirm every stay’s material and diameter, finished length, upper and lower terminal type, pin size, rigging-screw thread and the complete forestay or furler interface.

Yacht and Rig Details

ProductionUnited Kingdom, 1981–1983
LOA10.15 m
Beam3.40 m
Displacement4,797 kg
RigMasthead sloop
Mast steppingDeck stepped
Spreaders1

Moody 333 standing rigging

Indicative forestay/backstay/shroud diameter7 mm
Rigging type1x19 stainless steel wire
Indicative standing rigging cost£2,150 – £2,365 inc VAT

Furler and kicker recommendations

Genoa furler Furlex 204S — 13.50 m
Rodkicker Seldén Rodkicker 30 (Normal Gas)

Mast and boom recommendations

Suggested mast sectionC211
Indicative mast height14.21 m
Suggested boom sectionE300
Indicative boom foot length3.98 m
ReefingSlab reefing (2 reef lines)

Moody 333 running rigging

LineDiameterLengthSuggested rope
Main halyard 10 mm 30.5 m Dyneema
Genoa halyard 10 mm 32 m Dyneema
Spinnaker halyard 10 mm 34.4 m Dyneema
Genoa sheets 12 mm 20.5 m per sheet Marlow Ocean Braid
Main sheet 12 mm 10 m Marlow Ocean Braid

These specifications and prices are indicative only and should be verified against the rig and existing equipment on the individual yacht.

Boxed:

Sticky Add To Cart

Font: