WE NOW OFFER WORLDWIDE DELIVERY - YOU WILL SEE ALL THE DELIVERY OPTIONS ON CHECKOUT

The Southerly 135 is covered in our rigging database so owners can begin a replacement project with a consistent set of cost and equipment references. The page separates standing rigging from running rigging and deck equipment, making it easier to decide which items belong in the immediate refit and which can remain optional. Factory options and later refits can produce meaningful differences between sisterships, particularly around the forestay, furler, mast terminals and lower attachment points. Where measurements are being supplied remotely, clear photographs of every upper and lower termination should accompany the finished lengths, wire sizes, pin diameters and rigging-screw details.

Yacht and Rig Details

ProductionUnited Kingdom, 1983–2006
LOA13.86 m
Beam4.12 m
Displacement10,433 kg
RigMasthead sloop
Mast steppingDeck stepped
Spreaders1

Southerly 135 standing rigging

Indicative forestay/backstay/shroud diameter8 mm
Rigging type1x19 stainless steel wire
Indicative standing rigging cost£2,989 – £3,377 inc VAT

Furler and kicker recommendations

Genoa furler Furlex 204S — 8 mm / 11.30 m
Rodkicker Seldén Rodkicker 5 (Normal Gas)

Mast and boom recommendations

Suggested mast sectionC083
Indicative mast height17.50 m
Suggested boom sectionE165
Indicative boom foot length1.61 m
ReefingSlab reefing (2 reef lines)

Southerly 135 running rigging

LineDiameterLengthSuggested rope
Main halyard 12 mm 36.5 m Dyneema
Genoa halyard 12 mm 38.2 m Dyneema
Spinnaker halyard 12 mm 41 m Dyneema
Genoa sheets 14 mm 22.2 m per sheet Marlow Ocean Braid
Main sheet 14 mm 26.5 m Marlow Ocean Braid

These specifications and prices are indicative only and should be verified against the rig and existing equipment on the individual yacht.

Boxed:

Sticky Add To Cart

Font: