WE NOW OFFER WORLDWIDE DELIVERY - YOU WILL SEE ALL THE DELIVERY OPTIONS ON CHECKOUT

For a Hunter 34, this page provides a practical starting point for planning replacement standing rigging and related equipment work. If the project extends beyond the stays, the same page can also be used to review halyards and sheets, furling equipment, kicker options, winches and replacement spar guidance. Factory options and later refits can produce meaningful differences between sisterships, particularly around the forestay, furler, mast terminals and lower attachment points. If the old rigging is available, copying the original stay set after checking its condition and dimensions is usually more dependable than manufacturing solely from a model-based schedule.

Yacht and Rig Details

ProductionUnited States, 1973–1983
LOA10.36 m
Beam3.40 m
Displacement5,361 kg
RigSloop
Mast steppingDeck stepped
Spreaders2

Hunter 34 standing rigging

Indicative forestay/backstay/shroud diameter7 mm
Rigging type1x19 stainless steel wire
Indicative standing rigging cost£2,164 – £2,380 inc VAT

Furler and kicker recommendations

Genoa furler Furlex 204S — 6 mm / 13300 mm
Rodkicker Seldén Rodkicker 30 (Normal Gas)

Mast and boom recommendations

Suggested mast sectionC211
Indicative mast height14.00 m
Suggested boom sectionE300
Indicative boom foot length3.92 m
ReefingSlab reefing (2 reef lines)

Hunter 34 running rigging

LineDiameterLengthSuggested rope
Main halyard 10 mm 30.2 m Dyneema
Genoa halyard 10 mm 31.6 m Dyneema
Spinnaker halyard 10 mm 34 m Dyneema
Genoa sheets 12 mm 16.6 m per sheet Marlow Ocean Braid
Main sheet 12 mm 18.7 m Marlow Ocean Braid

These specifications and prices are indicative only and should be verified against the rig and existing equipment on the individual yacht.

Boxed:

Sticky Add To Cart

Font: