WE NOW OFFER WORLDWIDE DELIVERY - YOU WILL SEE ALL THE DELIVERY OPTIONS ON CHECKOUT

For a Contest 38, this page provides a practical starting point for planning replacement standing rigging and related equipment work. The standing-rigging section can be used for initial budgeting, while the running-rigging and equipment tables help identify additional work that may sensibly be completed at the same time. Even apparently standard production boats can acquire different fittings over time, so photographs and measurements from the current rig are more useful than relying on the model name alone. A reliable production schedule should record stay count, wire or rod size, finished dimensions, mast terminals, chainplate pins, turnbuckle threads and the forestay connection through the fitted furler.

Yacht and Rig Details

ProductionNetherlands, 1989–1996
LOA11.58 m
Beam3.47 m
Displacement14,258 kg
RigMasthead sloop
Mast steppingDeck stepped
Spreaders2

Contest 38 standing rigging

Indicative forestay/backstay/shroud diameter8 mm
Rigging type1x19 stainless steel wire
Indicative standing rigging cost£2,971 – £3,357 inc VAT

Furler and kicker recommendations

Genoa furler Furlex 204S — 7 mm / 9.05 m
Rodkicker Seldén Rodkicker 20 (Normal Gas)

Mast and boom recommendations

Suggested mast sectionC170
Indicative mast height16.79 m
Suggested boom sectionE270
Indicative boom foot length3.71 m
ReefingSlab reefing (3 reef lines)

Contest 38 running rigging

LineDiameterLengthSuggested rope
Main halyard 10 mm 35.2 m Dyneema
Genoa halyard 10 mm 36.9 m Dyneema
Spinnaker halyard 10 mm 39.6 m Dyneema
Genoa sheets 12 mm 18.5 m per sheet Marlow Ocean Braid
Main sheet 12 mm 21.6 m Marlow Ocean Braid

These specifications and prices are indicative only and should be verified against the rig and existing equipment on the individual yacht.

Boxed:

Sticky Add To Cart

Font: