The Contest 35 rigging guide is designed to help owners scope a replacement project before any parts are manufactured. The furler section is useful for checking whether the existing forestay system should be retained, replaced or considered alongside a wider furling upgrade. Previous rigging work can alter terminals, rigging screws, mast fittings or the forestay arrangement even when the basic yacht model has not changed. The final check should identify each stay individually and capture wire size, finished length, terminal geometry, pin diameters, rigging screws and any furler components that determine the forestay length.

Yacht and Rig Details

ProductionNetherlands, 1981–1983
LOA10.65 m
Beam3.55 m
Displacement11,440 kg
RigFractional sloop
Mast steppingDeck stepped
Spreaders1

Contest 35 standing rigging

Indicative forestay/backstay/shroud diameter6 mm
Rigging type1x19 stainless steel wire
Indicative standing rigging cost£1,656 – £1,817 inc VAT

Furler and kicker recommendations

Genoa furler Furlex 104S — 9.35 m
Rodkicker Seldén Rodkicker 20 (Normal Gas)

Mast and boom recommendations

Suggested mast sectionC170
Indicative mast height15.44 m
Suggested boom sectionE270
Indicative boom foot length5.15 m
ReefingSlab reefing (3 reef lines)

Contest 35 running rigging

LineDiameterLengthSuggested rope
Main halyard 10 mm 32.8 m Dyneema
Genoa halyard 10 mm 34.3 m Dyneema
Spinnaker halyard 10 mm 36.9 m Dyneema
Genoa sheets 12 mm 17 m per sheet Marlow Ocean Braid
Main sheet 12 mm 28.8 m Marlow Ocean Braid

These specifications and prices are indicative only and should be verified against the rig and existing equipment on the individual yacht.